General Repairs & Upgrades
View
Potential Course Changes
View
Major Course Changes

 

 

Course Items

  • New hole signage, with removable plaques
  • Replace ball washer timbers and decorative rocks with mulch and plant landscaping grasses.
  • Add natural grass areas on course, eliminating need to mow:
    • Behind #6 tee, and between #12 tee and #13 fairway
    • Between #6 fairway and #16 green
    • Open area right of #17 fairway, behind #9 tee
    • Open area on right side on #12 tee and fairway
    • Area behind #12 green

Hole #1

  • Add new championship tee box, approximately 20 yards back, in area next to the putting green. Completed Summer 2008
  • Replace timbers boarding cart path and tee box. Completed Summer 2008
  • Look into trimming overhanging tree limbs along right side of fairway. Completed Summer 2008
  • Steve Conlin, to locate existing drainage tile crossing #1 and #10 fairways. Steve will investigate the cost of connecting additional fingers to help drain low areas in front of green.
  • Add ties to help contain cart parking at green and add rocks to existing parking area. Completed Summer 2008

Hole #2

  • Remove small bush on right side of tee box.
  • Mow and trim tee box to full size. Completed Summer 2008
  • Trim overhanging branches from first large tree on left side of fairway. Completed Summer 2008
  • Look into method of adding drainage in low area at the end of cart path. Completed Summer 2008
  • Remove large bush just off the left side of the green.

Hole #3

  • Trim tee box to full size adding larger areas both in the rear and right of existing tee box.
  • Remove small trees on west side of creek bank just beyond bridge. Completed Summer 2008

Hole #4

  • Trim low hanging branches on left side of tee box. Completed Summer 2008
  • Remove small bushes on right side of cart path at tee box. Completed Summer 2008
  • Trim overhanging branches from large tree to left of green. Completed Summer 2008

Hole #5

  • Add rocks to worn area at turns along cart path to green. Completed Summer 2008

Hole #6

  • Build new tee box back (east) an additional 100-125 yards changing hole to a par 5.
  • Redesign existing tee box for women's tee and using remaining dirt to fill low areas in front of existing tee.
  • Remove tree to left of present tee box, opening up fairway. *All under construction, Fall 2008

Hole #7

  • Replace ties around cart turn island. Completed Summer 2008
  • Remove lower limbs & reshape trees @ creek on right side of fairway. Completed Summer 2008
  • Replace timbers with ties in front of back tees.

Hole #8

  • Remove small trees on right side of tee box, in with pines. Completed Summer 2008
  • Remove wind damaged tree behind green. Completed Summer 2008

Hole #9

  • Trim tee box to full size.
  • Remove bush in cart turn island. Completed Summer 2008


Hole #10

  • Complete reconstructed tee box. Construction started Fall 2008

Hole #14

  • No repairs or upgrades.

Hole #15

  • Contact City Water Dept. to repair caved-in sewer line in fairway.

Hole #16

  • Fill in low areas in fairway over drainage lines.
  • Replace sand trap at front right of green with grass bunker. Completed Summer 2008
  • Create new cart path for cart access between trap and tree on right side of green. Completed Summer 2008

Hole #17

  • Use aeration dirt to extend tee box back and enlarge for championship tee.

Hole #18

  • Trim overhanging limbs on left side of fairway.
  • Change from Par 4 to Par 3, 125 to 165 yards in length. Construction started Fall 2008

Back to Top

 

 

 

 

 

General

  • Rebuild tee boxes where necessary. Construction started Fall 2008

Hole #4

  • Remove cart path entrance and stone area on back right of #4 green. Completed Summer 2008

Hole #6

  • Build new tee box back (east) an additional 100-125 yards changing hole to a par 5. Construction started Fall 2008
  • Redesign existing tee box for women's tee and using remaining dirt to fill low areas in front of existing tee. Construction started Fall 2008
  • Remove tree to left of present tee box, opening up fairway. Construction started Fall 2008

Back to Top

 

 

 

 

 

Hole #9

  • Redesign fairway 25 yards right of existing fairway. Recreate existing treeline. Construction started Fall 2008

Driving Range

  • Redesign and expand driving range tee.
  • Expand range area to include pre-existing 18 fairway.